The supply ship, the American Tern at the ice pier and the Kracin out in the sound. The pier on the right where the ship is being offloaded is made of ice that is artificially thickened during the winter and then covered with dirt for insulation. This provides a location where the ship can navigate in enough water and get next to a pier.
<-Previous Photo||Next Photo->
Dome C Page
Return to Home
Page created 22 May 2005, Last updated 15 June 2005 22:15 Pacific Daylight Time