These pictures are from inside the tunnel that was constructed this summer. It will house the pipes and wires running to and from the new station. It's about 10 feet tall and 1800 feet long. The people, Kurt, Doug and John (left to right in bottom) are installing the pipes near the top of the tunnel.
<-Previous Photo||Next Photo->
South Pole Page
Return to Home
Page created 5 April 2001, Last updated 29 April 2001 01:34 New Zealand Standard Time.